You are here
Bikeway Conceptual Designs (Completed)
Project History
No project updates found
Project Family
- 
      2014 Campus Bike Plan
      - Bikeway Conceptual Designs
 
Associated Collections
Description
Related Files
 Armory Ave Path 220 210 200 790(1).pdf Armory Ave Path 220 210 200 790(1).pdf
 FAR Path 330.pdf FAR Path 330.pdf
 First Street 250.pdf First Street 250.pdf
 Florida Kirby 380 390.pdf Florida Kirby 380 390.pdf
 Fourth Street 260 440.pdf Fourth Street 260 440.pdf
 Goodwin Ave 20.pdf Goodwin Ave 20.pdf
 Gregory Drive 230.pdf Gregory Drive 230.pdf
 Hazelwood 580.pdf Hazelwood 580.pdf
 Lincoln Ave 310 320 540 520 530.pdf Lincoln Ave 310 320 540 520 530.pdf
 Lorado Taft 770 780.pdf Lorado Taft 770 780.pdf
 Main St Path 30 160.pdf Main St Path 30 160.pdf
 Mathews Ave Path 280 281.pdf Mathews Ave Path 280 281.pdf
 Oak St 460 370 360 470.pdf Oak St 460 370 360 470.pdf
 Peabody Drive 350.pdf Peabody Drive 350.pdf
 Pennsylvania 300.pdf Pennsylvania 300.pdf
 Race St 400.pdf Race St 400.pdf
 Sixth Street 270.pdf Sixth Street 270.pdf
 St Marys Road 410 420 430.pdf St Marys Road 410 420 430.pdf
 Stadium Drive 340.pdf Stadium Drive 340.pdf
 University Ave 10 15.pdf University Ave 10 15.pdf
Project Team
-   
  Project Leader:Holly Nelson
Dates
-   
  Completed July 1, 2012Completed by Holly Nelson
Themes
-   
  Primary Theme:
