You are here

Pages

  1. SSC funds Vision Zero for UI

    Vision Zero is an international organization with the primary goal of promoting zero fatal and severe injury crashes in cities and communities. This is done by implementing practices which go beyond the traditional approaches to safety – by combing data-driven decision making with the incorporation of human error, community input, and implementing a “Safe Systems” approach. This project’s goal is to have zero traffic crashes at UIUC, making it a safer environment for students and staff. It is expected that traffic incidents will increase on campus due to the rise in bike ridership and construction. This project will investigate which Vision Zero principles could be implemented in order to prevent these dangers, resulting in a report that identifies the safety critical point in the transportation network that can be improved according to Vision Zero.

  2. SSC funds Wagglenet

    The primary goal of this project is to create an intuitive and complete open-source loT solution for both research and general use. This system will make data collection as easy as placing sensors where they are needed and adding them to the system through only a few button clicks, after which the cloud-based platform will take care of everything else. The open-source nature of the project leverages non-proprietary solutions and allows developers to expand the data-collection system to new uses. The more ambitious goal of the project is to bridge the gap between research and application. Users will have an opportunity to share data with any research project and benefit from predictive analytics models derived from researchers’ findings in return. The idea is for this feedback loop it greatly speed up the research process and dramatically cut down the efforts to speed the transition of research outcome into practical benefit.

  3. SSC funds Wastewater Elimination & Scale Up Restoration

    The Illinois Biodiesel Initiative (IBI) is a student-led organization that works to promote the development of renewable energy production at UIUC and to educate the campus community about the advantages of biodiesel. Their primary focus is the production of biodiesel and soap from a feedstock of used vegetable oil obtained from the University Dining Halls. In the past, biodiesel produced by IBI was utilized by University Garage and Carpool Services. With the addition of a glass-lined 400 gallon batch biodiesel reactor and relocation to the Integrated Bioprocessing Research Laboratory, IBI will be able to continue to do so. The funding from this project will be allow for the purchase of this reactor, which will enable IBI to increase its production capacity and recycle larger quantities of used vegetable oil.

  4. SSC funds Energy Shaft at the Energy Farm

    This student-led project will involve the design, construction, and installation of an energy geo-structure for heating the UIUC Energy Farm, located near the southeast corner of Race Street and Curtis Road on the South Farms. This project has great potential in exploring and utilizing geothermal energy, a renewable energy alternative to fossil fuels. An energy shaft is a new technology designed to access the shallow geothermal energy (relatively constant ground temperature in the upper 30 m of the subsurface). The objective of the project is to determine the feasibility of using drilled shafts that are already being used to support structures on campus also as a geothermal heat-exchange element. Geothermal heat exchangers (closed absorber pipes) can be incorporated into underground infrastructure, e.g., drilled shafts, through which water is circulated to withdraw shallow geothermal heat (~55 °F) and transport it to the surface for structure heating or cooling.

  5. SSC funds Red Oak Rain Garden Sidewalks

    Located just south of Allen Hall/LAR and west of McKinley Health Center, the Red Oak Rain Garden solves local flooding issues while providing an outdoor space for the UIUC community. This SSC grant provides support for sidewalk modifications and additions, expanding pedestrian and cyclist transportation while strengthening flood control. The project team will also install benches to encourage community members to use the space throughout the year. For outreach, the project team will host a ribbon cutting event that celebrates the upgraded rain garden. Similarly, individuals can follow the rain garden @RainGardenUIUC on all social media platforms. 

  6. Meeting Minutes for iWG February, 2019

  7. 18F Semesterly Report - Beginning bike maintenance classes

     

    Simon taught 15 sessions with around 100 attendants total, over the 15 weeks. The sessions were Mondays from at 6:30. The sessions began on 9/5/2017 and concluded at the end of the fall semester.

     

    The manager of the Campus Bike Center, Jake Benjamin, will help us seek another qualified student to teach the class this spring.

     

  8. SSC Funds Hillel Micro Grant

    Illini Hillel Center for Jewish Life on Campus (the Center) has been working toward creating a more sustainable Center for the last few years. Starting with a student driven initiative to purchase and install a filtered, reusable water bottle filler, the Center has been working to improve its environmental impact in more ways. We would like to prepare a locally sourced Sabbath dinner for our community, using that time together to educate the community about our sustainability initiatives.

  9. Final Report submitted to SSC - Speech and Hearing Solar

     

    This project was originally proposed by Mechanical Engineering students for Abbott Power Plant in spring 2016.  At that time, the SSC members did not want to support solar on the co-generation power plant because it uses fossil fuels.  They asked if we could use it on a different campus roof, and we considered all the large or medium campus roofs.

     

    The SSC asked us to identify a building that could have solar added, so I reached out to Applied Health Sciences in 2016 for approval to use the Speech and Hearing Sciences Building.  Since that time, Kristine Chalifoux confirmed that the roof is strong enough for solar panels, due to a previous change in the insulation materials.  Brian Finet completed design drawings for installing solar on the full available roof, and the Architecture Review Committee confirmed the building is allowed to have solar added.  

     

    After the engineering design work, the remaining funds were about $35K.  This fall, we received a construction estimate from Jeff Holt for upgrading the electrical system to handle a 70 kW solar PV array.  It would cost about $42K if done in conjunction with your capital project, just to get the wiring up to the roof and ready to punch through and install panels later.  Rather than ask the SSC for additional funding and an extension, I am returning the remaining dollars and putting this project on indefinite hold. 

     

    The overall campus goals for on-campus solar generation are listed in the 2015 Illinois Climate Action Plan (iCAP), which will be updated for 2020.  The current objective is to generate 25,000 MWh/year of on-campus solar, and we are currently at about 7,000 MWh/year.  Per the direction received from Chancellor Jones, we are working on a second large-scale solar farm to meet the goal, rather than several smaller-scale projects. 

     

    The second solar farm is planned to be about 12,000 kW in name-plate capacity, significantly more than the 70 kW rooftop array for Speech and Hearing.  Rooftop solar is still an option, and several departments continue to install them at the building scale. The design drawings are posted online through the iCAP Portal, at https://icap.sustainability.illinois.edu/project/speech-and-hearing-rooftop-solar-pvs, for future use.

     

  10. Final Report submitted to SSC - Illini Bikes

     

    The goal of this project was to support installation of high density bike parking in an area of campus with high needs for additional bike racks, and provide an amenity for campus cyclists with a unique shelter structure protecting parked bikes from the winter elements at the Main Library.  This funding purchased the bike shelter and high-density racks.  The shelter will be installed at the Main Library, after completion of the MCORE construction work on Wright Street and Armory Avenue.

     

  11. 18F Semesterly Report - CornCrete

    The most significant development to date is that two buildings have been identified in which the material the team is work with will be installed, one is a single-story building of approximately 400 sq/ft the other has a double height space and a footprint off approximately 1,600 sq/ft that will be enclosed using the material in development.

  12. 18F Semesterly Report - Baler Conceptualization

     

    On March 1, 2018, Morgan White, Pete Varney, and Shawn Patterson met with capital planner Trent Beane, a representative of the engineering firm, and a manufacturer’s rep from Dehart Recycling.  We discussed the project needs, and the current status of the WTS equipment.  Some notable points are listed below:

    • The existing baler was installed in 1996
    • Design of balers has changes a lot, with lower labor costs and alternatives to the perforator currently used at WTS.
    • The power supply is probably similar to the existing power demand.

    After the meeting, the engineering firm was asked to provide a formal proposal to F&S to approve and begin the design work.  Unfortunately, this process was delayed due to emergency family medical issues for Mr. Beane. 

     

    In August 2018, a new planner was assigned, Chris Anzelmo. Anzelmo finalized the agreement with the engineering firm and arranged a kick-off meeting.  In November 2018, the engineer visited the Illinois Sustainable Technology Center (ISTC) to examine the Styrofoam densifier and gathered additional information from the WTS.

     

    Then on December 13, 2018, preliminary drawings were shared with F&S. At that meeting, discussions included the needs for modifying the “pit” at the base of the baler entry system, adjusting the pathway width between the baler and the north wall, and recognition that locating the Styrofoam densifier at the WTS would require a building addition. Information about the HVAC system and required code updates were also reviewed.

     

    On January 2, 2019, a baler vendor representative met with us at the WTS. They are going to look at an alternative baler that could provide the needed walkway space on the north end and use the existing pit.

     

     

  13. Final Report submitted to SSC - EcoConcept

    The target dates listed in the original application have become irrelevant as two years have passed since the application date. However, this year the team built a new carbon fiber chassis and body for the first time in multiple years which was one of the major goals listed in the original application. The car was named EV-1. Because many of the project leads graduated, the team went through drastic leadership changes and lost most of its knowledge about carbon fiber work. Tremendous efforts were made by the remaining members, which ultimately led to our team relearning how to work with carbon fiber. This allowed us to create our first new and completely customized carbon fiber chassis. This year’s chassis design allowed for a decrease in weight and higher structural strength compared to prior designs. The team also switched fuel categories to keep up with the growing focus on battery powered vehicles. Doing so entailed manufacturing a battery powerful enough to power the concept car as well as designing a safe battery management system. The battery successfully passed the official Shell Eco-Marathon safety inspection. Switching to the battery electric fuel category reduced the overall weight of the vehicle as there is no longer a bulky hydrogen fuel cell and hydrogen cylinder in the car. The team participated in the Shell Eco-Marathon 2018 competition on the Sonoma Raceway. EV-1 passed the technical and safety inspections which are a set of rigorous tests performed to ensure the safety of the driver and other participants. Many teams do not make it past these inspections. While last minute technical difficulties disabled the team from qualifying to compete, EV-1 was featured in the front row of Shell’s family portrait.

  14. 18F Semesterly Report - LED Classroom Updates

    Most of the incandescent lamps in the General Assignment classrooms have been replaced with LED lamps at this point.  Several classrooms have also had new dimmers installed to properly control the lights.  Four more buildings have been started and need to be completed.

Pages

Subscribe to