    The University pays a stormwater utility fee to both the City of Urbana and the City of Champaign.  The fee is based on total impervious area that drains into city-owned storm sewers. If stormwater drains into university-owned sewers then directly discharges to a receiving stream, there is no fee assessed.

    • The current rate for the City of Champaign is $5.24/3,478 sq ft.
    • The current rate for the City of Urbana is $5.14/3,100 sq ft.

    There are credits and incentives that the university can apply toward the stormwater utility fee. By maintaining compliance with the university’s Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination Systems (NPDES), the university receives a 5% credit from each city. Additionally, each city has their own Credit and Incentive Manual (attached) which provides an opportunity for the university to reduce their stormwater utility fee by reducing the impact of the runoff from their properties by methods such as installing sustainable storm water practices that allow stormwater to infiltrate into the ground. The manuals have specific guidelines on how to calculate the credits based on the particular stormwater practices that are employed.

  2. Pricing Breaks for higher quantities

    Associated Project(s): 

    Hi Solar UC Advisory Committee,

    The Midwest Renewable Energy Association (MREA) has accepted the Solar Urbana-Champaign Advisory Committee’s recommendation and contracted with New Prairie Construction to install solar arrays for the second round of our group buy program.  MREA and New Prairie Construction have agreed to an amended fee schedule whereby New Prairie will be providing a rebate which will be paid to program participants who sign a contract for services by August 31, 2017 according to the following schedule: $.03/watt if the program reaches 50-150 kW of total capacity; $.06/watt for 150-250 kW; $.09/watt for installed capacity in excess of 250 kW. 

    Please keep an eye on solarurbanachampaign.com as we will be announcing Solar Power Hours very soon.  Please share these event announcements through your networks and let us know of any ideas for additional public engagement.

    Thanks!

    Scott

     

    Scott R. Tess

    Environmental Sustainability Manager

    City of Urbana, IL

    P: 217-384-2381   -   F: 217-819-3167

    706 S. Glover Ave. Urbana, IL 61802

    Walk Score®61 out of 100

    Bike Routeswww.urbanaillinois.us/bike-urbana

    Plan Your Bus Triphttp://www.cumtd.com or 384-8188

  3. Rates of participation in Eco-Olympics by residence hall

    Associated Project(s): 

    Hello Eco-Olympic followers!

    It's not too late to sign up! For those who have their team up and running, I highly encourage you all to meet before spring break begins. Once we get back, the competition is on! If you let me know the time and place, I can bring shirts to hand out.

    Here is the count of participants signed up for each hall:

    Remember that each person signed up gives your one point towards the participation price! Have some tabling events to get people interested!

    Best,

    Jessica Mondello
    Eco-Olympics | Director

    Think Globally. Act Locally.

     

  4. PWR SWATeam Minutes 3/15

    At the PWR SWAT Team meeting on March 15th, the team debated over the message in the new Ethics Compliance Message concerning recycling standards and rules. The team decided that two videos should be created, one with base instructions for recycling, the other for explaining the commonly misunderstood paper policy. The team will look more into the paper policy draft and suggest a new paper policy for the campus. 

    Attached Files: 
  5. Sustainability interns continue work updating iCAP Portal project pages

    CEE students Chenxi Jiang and Shuang Chen are working with Morgan Johnston to edit the iCAP Portal project pages for each iCAP objective.  Chapters 8-12 do not have SWATeams, and the background research on these chapters has been completed.  The edited project pages are scheduled to be online by the end of March.  The next step is editing the iCAP objectives for each SWATeam chapter in the iCAP.  Chenxi and Shaung will be meeting with SWATeam representatives over the next few weeks to gather information, and then the project pages will be edited to reflect the latest info.  We expect to be able to complete this before Earth Day on April 22, 2017.

  6. South Campus Afforestation Recommendation - Assessment with comments

    The iCAP Working Group (iWG) met on Feb 16, 2017. They supported the South Campus Afforestation recommendation. Their official comments for this recommendation was:

    "The iCAP includes an objective to add 50 acres of trees on campus, and this SWATeam recommendation suggests one potential location. The iWG suggests the College of ACES work with the Campus Master Planning committee to identify appropriate locations for additional trees. Another option to consider is parallel to the Embarras River."

    See attached the iWG assessment complete with comments from all the iWG members.

    See ALUFS003 South Campus Afforestation Recommendation

  7. Weekly Update

    All, Happy Monday! Last week was a steady busy one. We routinely had peaks of busyness and fallow valleys. We had 97 visitors through the doors, including staff. We grossed $951.50. We sold two bikes for $335; one build-a-bike for $61; and 4 memberships for $120.

    Overall, last week I was met with a little more enthusiasm for the space than I regularly receive upon explaining the cost structure and mission of the CBC to new visitors. That was nice. Our for-sale bike count after last week sits at 14 for-sale bikes. I keep trying to grow that number up into the 20s but people keep buying them. That’s not a bad thing, I suppose.

    Additionally, the two Departmental Share bikes need parts that are on-order so that project will be delayed, unfortunately.

    Our numbers for B-a-Bs last year was quite low and as such I will begin photographing—with permission—all those who complete build-a-bikes and posting them on social media, which will serve two important functions: advertising for CBC and its most education-intensive program; and having a picture of owner and bicycle in the event of a stolen or lost bike.

    This week I am going to cull a few more unbuiildable bikes from the pile and concentrate heavily on ramping up the for-sale numbers since this week of cold, snowy weather should keep the shoppers at bay. I will additionally focus on drop-bar bicycles, since I’ve noticed people requesting and looking for those more than the about-town cruisers and flat-bar bikes we have for sale, irrespective of how well-suited they are to campus riding.

    Sincerely,

    Jake Benjamin

    Campus Bike Center Manager

  8. Provost Office approves funding for LED Exit Signs

    The Office of the Provost approved $75,000 in one-time funding for the next step in the LED Exit Sign retrofit project.  The funding of $75,000 is for LED Exit Sign lighting replacement, additions, and new building surveys.  Material and labor of $70,000 would be used to replace 343 fixtures in 20 buildings at an average rate of $204/fixture.  An additional $5,000 is proposed to survey 50 campus buildings for exit light counts.  That will provide the input necessary for the next phase, once this phase is completed.

  9. EGEN SWATeam Meeting (3.10.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Associate Director for Campus Sustainability Ximing Cai and his vision for iSEE
    • Biomass boiler at Energy Farm
    • Opportunities for Geothermal on campus
  10. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Comments needed on Illini Lights Out (ILO) recommendation;

    2) Illini Lights Out final planning for 10th of March;

    3) Building level energy consumption report;

    4) Participation in Earth Hour and Earth week activities on campus;

    5) Updates on the Green Labs Coordinator;

    6) Planning for a campus walk focused on space utilization.

     

  11. iWG Meeting Notes from Jan. 27, 2017

    The iCAP Working Group met and discussed the following agenda items.  Meeting notes are attached.

    1. Brief iCAP Portal overview by Morgan
    2. Discuss any updates to Water002, Cooling Tower Increase COC
    3. Discuss Trans008, Bike Parking in Ramps
    4. Discuss updates to Econs004, Green Labs Coordinator
    5. Consider issues with recommendation process and view recommendation tracker

    Attached Files: 
  12. Sustainability staff discussed the outreach programs on the portal

    Morgan Johnston, Catherine Yee, and Chenxi Jiang met today to discuss the outreach information listed on the iCAP Portal.  Catherine described the Student Sustainability Leadership Council (SSLC) and the Certified Green Office Program (CGOP).  We also discussed the Earth Week efforts and the overall purpose of the SSLC as a networking opportunity for students in sustainability groups.

  13. archived info - previous project description

    Associated Project(s): 

    A main component of the 2010 iCAP is to engage the outside community in working to create a more sustainable campus. The University of  Illinois is working to enhance its engagement activities in the arena of sustainability. Champaign County Network (CCNet) is an effort to engage the campus and the surrounding community in a shared discourse on the critical sustainability and climate issues ahead. The University's Office of Corporate Relations is working to enhance collaborations with corporations in sustainability activities.

    The iCAP provides an opportunity to engage the outside community in a dialogue on the University’s role in helping to resolve community climate responses. For example, the Smart Energy Design Assistance Center (SEDAC) is designed to provide assistance to public and private interests in reducing and conserving their operational energy use in buildings. This type of information is an important step in developing meaningful solutions to climate change.

  14. March 3, 2017 Meeting

    3/3/17

    Summary: This meeting served to update and refocus the team, as well as to further discuss Lily Wilcox’s suggestion for her bike-cage recommendation.

    In attendance:

    Josh Feldman

    Morgan Johnston

    Brian Farber

    Pete Varney

    Lily Wilcox - Active Transportation Coordinator

    Topics Covered:

    New IWG chair – Ximing Cai

    Ben McCall has stepped down as the iCAP working group chair and will be replaced by Ximing Cai, who will start on March 1st. Morgan Johnston will serve as the interim chair until then. Ximing wants to tie iSEE to other campus sustainability programs better, and wants faculty outside of iSEE more involved.

    IWG wants recommendations

    The iCAP working group is asking for feedback as to how well recommendations are working from our perspective. They hope to have a summary for recommendations by May. For instance, you might note that it is hard to have faculty engagement, or that the SWATeam isn’t getting enough feedback. If you have suggestions you would like IWG to hear, email Morgan Johnston.

    Bike Parking Cage proposal

    Last semester, Lily Wilcox introduced a suggestion to have secure cages for bike storage in all new parking structures. Those who would like to use these structures would pay for a permit. The team has not yet decided to agree completely on the proposal as we are still working out how to address some specific concerns.

    The most important concern is cost. These cages are expected to cost approximately $60,000, and will be in use for the 30-50 year lifespan of the parking structure. Morgan noted that these cages would likely be in high demand, so we could charge upwards of $85-$100 per year for a permit, similar to universities like Ohio State and Minnesota.

    Additionally, we discussed who the primary customers would be. Likely, the primary buyers would be day-riders and some students. Morgan suggested that we talk to campus recreation about the idea as well.

    Finally, we discussed some of the implementation challenges of the proposal. Brian mentioned that having bike riders in a parking garage create a safety hazard as cars may not be aware of or expect bike riders. Furthermore, any malfunction of the card-swipe system would be a huge inconvenience for anyone who needs to retrieve their bike.

    Overall, we have not yet formally agreed to go ahead with the recommendation but will continue to discuss it until we work out these issues.

    Next Meeting

    Our next meeting will be Thursday, March 16 at 1pm. This meeting will take place on Thursday so as to not be right before spring break.

  15. Conservation Budget Recommendation (ECONS003) - Transmittal to the Council

    ECONS003 Conservation Budget Recommendation was transmitted to the Office of the Provost on March 6, 2017. The Council discussed the recommendation at this meeting.

    See iWG Assessment of ECONS003 Conservation Budget

    See SWATeam Recommendation of ECONS003 Conservation Budget

  16. EGen005 Rooftop Solar Standards recommendation - Transmittal

    Following the completion of iWG assessment, the SWATeam recommendation EGen005 Rooftop Solar Standards was transmitted to the Sustainability Council on March 6, 2017.

    See iWG Assessment for SWATeam recommendation EGen005 Rooftop Solar Standard here.

    See SWATeam recommendation EGen005 Rooftop Solar Standards here.

Pages