You are here

Projects Updates for place: Loomis Laboratory

  1. meeting with Morgan and Amy

    Associated Project(s): 

    Amy Liu and Morgan Johnston discussed the process for moving forward.

    1. Morgan will submit a work order to F&S installers.
    2. Morgan will schedule a tour of the proposed locations, with Amy, Morgan, and the F&S installation contact.
    3. F&S installers will proceed to install the glass fillers as quickly as possible, in the order previous identified.
    4. Amy will meet with the Illinois Student Senate, Environmental Sustainability Committee, to seek their attention to this project.
    5. Amy will continue working on the anti-water bottle campaign.

     

  2. List of Locations

    Associated Project(s): 

    David Mischiu and Amy Liu met today to form a very basic list of priority buildings for filler installment. Additionally, they determined which floors for each building would be most useful to have them on. Here is the list, 1 indicating highest priority. 

    1. Undergraduate Library, floors 1 and ground level
    2. Grainger Library, all floors
    3. Ikenberry Commons, floor 1
    4. Armory, floors 1 and 3
    5. Wohlers Hall, floors 1 and 2
    6. Loomis Lab, floors 1 and 2
    7. Siebel Center, basement and floor 1
    8. Natural Resources Building, floors 1 and 2

    They still want to take a look a few more buildings in the quad. Whatever is surveyed from that might not even change the list presented already, but add to how this project could materialize in the future.

  3. Prioritizing locations

    Associated Project(s): 

    Morgan reached out to Felicia Speranske to get a current contact with the ISS for this project.  The funding was delayed, arriving in late June, rather than mid May, and this project is waiting for a list of priority locations to begin installation.  Morgan also sent an email to Damani Bolden the Illinois Student Senate (ISS) president.

  4. Glass Filler Retrofit_Funding Award and Acceptance

    By providing convenient bottle filling stations at water fountains in several heavily-trafficked campus buildings and libraries, the goal of this project was to wean the student body off of plastic water bottle consumption, lower campus waste generation, and encourage students, faculty, staff, and visitors to adopt environmentally-conscious habits. A marketing campaign called “Tap That” was coordinated to publicize the project and educate the campus community about the numerous benefits of reusable water bottles. In total, the project expenses were $15,160.

  5. bike parking review meeting

    Associated Project(s): 

    Stacey DeLorenzo, Amelia Neptune, Morgan Johnston, and Noel Grove met to review the bike parking estimates for this project.  There are a few locations where the pavement is in terrible condition, so we discussed options for handling those locations.  The racks could be installed on rails, or the pavement could be replaced.  There were also a few locations where there are conflicting major projects occuring in the near future.  Stacey will talk to the project managers for those sites to work through the solutions for the bike parking installation.

    Additionally, this project includes the installation of one bike fix-it station at Allen Hall.  Amelia began this work and Stacey will take it over now.  Stacey and Amelia will meet with Sean Sullivan in the SSC to provide him with an update.  Noel Grove will provide cost break downs with the pavement work separate from the bike rack installation work.  He will also contact the Iron Workers to discuss options for racks on rails built in-house.

  6. Bike fix-it station update

    Associated Project(s): 

    From: Neptune, Amelia
    Sent: Tuesday, May 14, 2013 12:27 PM
    To: Ortiz, Benita Vonne
    Cc: Johnston, Morgan B
    Subject: Bicycle Repair Station outside of Allen Hall

    Hi Vonne,

    As you may recall, earlier in the school year we had discussed that there is some funding for a new bicycle repair station near Allen Hall/CRCE. The original location we proposed near Gregory Drive in front of CRCE was rejected by the Architecture Review Committee, and they have proposed a better location near the bike parking area in front of Allen Hall. I would like to get your OK on this location before we move forward.

    The first attached PDF shows the location proposed by the Architecture Review Committee. As you’ll see in the photos on pages 2 and 3, it is on existing pavement, close to the bike parking, but not blocking a walkway, which I think is ideal.

    The second PDF shows the specifications of the newly designed repair stations so you know what it would look like. The new design is much smaller and (in my opinion) more attractive than the existing repair stations we have elsewhere on campus. The blue color of the existing stations is no longer available, so our plan is to match the color of the adjacent bike parking, in this case black.

    Please let me know if Housing has any objections to this location, or would like to meet there in person to discuss it further. Once I have your approval, we’ll move forward placing the order and installing this summer.  Please let me know if there are any questions.

    Thank you,

    Amelia  

    =========================================

    Amelia Neptune

    Campus Bicycle Coordinator

    University of Illinois at Urbana-Champaign

    1501 S. Oak, Champaign, IL 61820

    aneptune@illinois.edu

    217-300-1316

  7. Art and Design bike racks funded

    Associated Project(s): 

    To Davie Akins, Please proceed with the bike parking upgrade on the west side of Art and Design, per the previous discussions we have had.  The SSC funding will contribute $11,849.50 from CFOP: 1-629514-814006-xxxxxx-191200-814BIK. - from Morgan Johnston

  8. Cost estimates requested for first 5 locations

    Associated Project(s): 

    Transportation staff submitted work order requests to have cost estimates for time and materials for the first five locations to be upgraded from donut hole bike parking to U-rack bike parking.  The remaining nine locations need to have CAD drawings produced and apprroved before costs can be estimated.  

  9. Campus Bike Parking Overhaul Phase 1_Funding Award and Acceptance

  10. Campus-wide Bike Parking Funding Agreement

    Bike parking is essential for supporting green commuters as well as raising awareness and supporting biking on campus. In 2009, the SSC funded $10,600 for standard bike parking at three popular locations on campus, Freer Hall, the Undergraduate Library, and the Agricultural Engineering Sciences Building. Later in 2012, SSC provided $225,000 in order to replace old donut-hole bike parking with U-loop parking at the Armory, the Main Library, the Foreign Language Building, and other high-traffic areas on campus.

  11. Bike Parking Funding Agreement

    The goal of this project is to fund installation of bicycle parking facilities at the Undergraduate Library, the Ag. Sciences Engineering Building and Freer Hall. Cycling is a sustainable form of transportation, highly used by the student body, and inadequately supported on campus. Thus the students sustainability committee is in favor of funding the full requested amount of $10,600.  

Pages

Subscribe to