SSC Final Report: Campus Bike Parking Overhaul, Phase 1
SSC funded the Campus Bike Parking Overhaul, Phase 1 project in FY12 for $225,000. Please see attached the final report pertaining to this project.
SSC funded the Campus Bike Parking Overhaul, Phase 1 project in FY12 for $225,000. Please see attached the final report pertaining to this project.
Please see attached the inventory spreadsheet.
Total Donut Holes from FY12 | 2302 |
Remaining Donut Holes as of 4/7/20 | 240 |
% remaining | 10.43% |
% removed as of 4/7/20 | 89.57% |
Hello ECIP winners,
When the Energy Conservation Incentive Program (ECIP) was launched in 2013, it included financial awards that distributed some of the centrally managed campus utility funds back to the winning buildings. The calculation system was based on placement (first place to fourth place) in the awards program and the award category (occupant action or energy advancement). You can see the calculation in the attached fact sheet from 2016, if you are interested. With the Integrated and Value-Centered Budget (IVCB) reform, we transitioned this year, and we are closing out the initial phase one of the ECIP.
Some of the original award funding has not yet been allocated to an associated facility improvement project. If you have remaining funds and have not yet committed to a specific project, please do so as soon as possible. All ECIP award funds must be committed by the end of this fiscal year, so please let us know your plans.
Now in phase two, the ECIP awards include a plaque and the associated prestige, and no additional monetary awards (see attached revised fact sheet). Instead, your colleges will benefit directly from the energy savings. Additionally, to increase the visibility of the great progress all of you have made, we are collaborating with the Illinois Solar Decathlon’s Concept Team (incoming freshmen, learning about building systems and sustainability). They will be completing a simple Building-Level Energy Report card for the 50+ ECIP winners this fall. In the spring, I will send those reports to you with an opportunity to connect with the Concept Team members.
Later this week, I will send a follow up email to the FY19 winners with images to help you spread awareness of this award. Congratulations again to all of you, and thank you very much for your past and ongoing contributions to the campus sustainability and energy efficiency efforts.
Sincerely,
Morgan
|
||||||||||||||||
|
||||||||||||||||
|
||||||||||||||||
|
Facilities & Services |
|
||||||||||||||
|
Here are the winners for the 2018 ECIP Awards!
Occupant Action | % Improvement | Incentive Award |
1. Turner Hall | 21.8% | $103,130 |
2. Art and Design Building | 19.9% | $37,816 |
3. Burrill Hall | 19.8% | $57,518 |
Energy Advancement | % Improvement | Incentive Award |
1. Coordinated Science Laboratory | 47.2% | $84,308 |
2. Seitz Materials Research Laboratory | 44.4% | $91,537 |
3. Loomis Laboratory of Physics | 40.7% | $25,717 |
4. Harker Hall | 38.0% | $10,000 |
Join iSEE, the Student Sustainability Committee and Facilities & Services for a "plogging" fun run/walk, a tour of Abbott Power Plant, a celebration event with organizations and RSOs that includes the Energy Conservation Incentive Program awards and updates on Illinois Climate Action Plan goals, a socially responsible investing program, and the popular Illini Lights Out energy savings event.
Tony Mancuso . Institute for Sustainability, Energy, and Environment (iSEE)
Here is a fun new addition to the education effort on the new bike infrastructure on campus.
https://mtd.org/inside/mtd-pulse/how-to-use-a-bike-box-stop-turn-wait/
Occupant Action Category |
% Improvement |
Incentive Award |
1. Foellinger Auditorium | 41.0% | $61,994 |
2. Natural Resources Building | 21.0% | $38,543 |
3. 1207 W. Oregon | 19.4% | $15,677 |
4. Agricultural Engineering Sciences Building |
13.6% | $12,986 |
Energy Advancement Category |
% Improvement |
Incentive Award |
1. Early Child Development Laboratory |
25.2% | $10,000* |
2. Administrative Information Technology Services Building |
24.1% | $10,000* |
3. Astronomy Building | 23.4% | $10,000* |
4. ACES Library, Information & Alumni Center |
23.2% | $10,000* |
see file
In July 2017, the vendor with whom the UIUC campus had partnered for EPS recycling was purchased by another vendor that was not able to continue the partnership. Central funding for transporting EPS to drop-off locations ended. Departments that had been participating in the Styrecycle program will be notified of the changed circumstances and will be encouraged to arrange their own transporation of EPS to the drop-off location at Dart Container, 1505 E. Main St., Urbana. There is no charge to drop off EPS at Dart. F&S is exploring options to provide an EPS recycling location on campus.
The following content was replaced with new program information on Oct. 15, 2017:
The University of Illinois at Urbana-Champaign (UIUC) now recycles expanded polystyrene (EPS), more commonly known by its brand name Styrofoam. By recycling this bulky material, we can reduce the volume of waste sent from campus to landfills and avoid the harmful environmental impacts of that practice.
The Styrecycle program was started in Fall 2015 and partnered with Community Resource Inc. (CRI) to bring EPS recycling to the UIUC campus. Our program can help you do your part to reduce the volume of waste campus sends to landfill — waste which will never biodegrade.
To find out more about Styrecycle, you can visit our website at: http://sustainability.illinois.edu/campus-sustainability/actionsinitiatives/styrecycle/
Or Like us on our Facebook page: www.facebook.com/Styrecycle
The Division of Intercollegiate Athletics (DIA) is looking to become more involved with the SWATeams and sustainability on campus. ECBS proposed ideas such as decreasing refrigerator usage, making a climate action plan specifically for DIA, and promoting recycling at tailgates. Illini Lights Out had their first event on September 29, and it was a success. 284 light switches were turned off in 13 different buildings. The Green Labs Coordinator position is slowly making progress, but there is a concern with funding. Updates on the ECIP were made, and there is a push being made for mid-year checkpoints in the future. ECBS also discussed if AFMFA projects could be redefined in order to do more maintenance-based projects.
the densifier was picked up from the off-campus location at Midwest Fiber on Friday (September 22, 2017) and is currently in storage at the Illinois Sustainable Technology Center (ISTC)
Welcome to MTD's Fall 2017 Service Year
MTD’s 2017-18 service year began yesterday and new Maps & Schedules books are now available on our buses and at Illinois Terminal. Pick up yours today & let us know if you have any questions-just call 217.384.8188 or email us.
In addition to a few timetable and routing adjustments, our passengers and the public should be aware of several larger changes this year: MTD has moved to a Designated Stops system, Round Barn Road in Champaign is now the main transfer point for routes in west Champaign, and MCORE project work will continue to cause reroutes in and around Campustown.
School trips for Unit 4 and District 116 middle and high schoolers will begin this Wednesday, August 16, and just prior to University of Illinois classes beginning Monday, August 28, all summer service reductions will end on Friday, August 25.
See you soon on the bus, trail, sidewalk or at Illinois Terminal!
Introducing Designated Stops
MTD's Fall 2017 Service Year began on Sunday, August 13, 2017, the same day our new Maps & Schedules book went into effect.
One major change this fall is the introduction of system-wide designated stops. Several Open Houses were held to solicit input from the public, and MTD staff compiled and incorporated the comments into our planning process. A full list of designated stops locations and maps are available at cumtd.com in our "Documents" section under Designated Stops Fall 2017.
We're here to help you with this new system. To find or verify your nearest designated stop, give us a call at 217.384.8188 or send us an email.
State of the (Illini) Union
MCORE Project work in front of the Illini Union is progressing and reroutes are ongoing. Follow MTD on Facebook or Twitter for reroute information & updates, like this drone footage from Overhead Ag.
Illinois Terminal Expansion Announced
Developer Hans Grotelueschen’s major downtown Champaign project once sited at Washington and Walnut streets will move several blocks south and east to merge with a planned expansion of Illinois Terminal by the Champaign-Urbana Mass Transit District (MTD).
As part of a new vision for this development, Grotelueschen and MTD officials are also evaluating a hockey arena and athletics event center for approximately 5000 spectators. In so doing, they hope to partner with the University of Illinois Division of Intercollegiate Athletics (DIA), which recently announced that it was studying the feasibility of adding Division I ice hockey. Read More>
In the News
Did you happen to catch MTD Grant Manager Jane Sullivan's Getting Personal piece in yesterday's News-Gazette or WCIA's recent story on Operator Goodrich? We're proud of our people! Take a few minutes to learn more about who drives MTD.
The Unviersity purchased an additional 16 3-loop, 20 4-loop, and 50 5-loop rail-mounted bicycle racks from RJ Thomas Manufacturing Co. Inc. in FY17. These bike racks were received in Spring 2017.
STYRECYCLE: During the spring 2017 semester, student volunteers collected more than 500 pounds of expanded polystyrene for recycling — bringing their total collected to nearly 900 pounds. In addition, this program is saying goodbye to a founding member and longtime leader. Thank you to Marco Tijoe for your two years of steering the ship!
Morgan Johnston and Shawna Grady met to discuss the potential uses for the Transportation Building's ECIP funding award ($10,000). Options included additional recycling bins, LED lamps, power strips, battery recycling containers, and potentially a waste characterization study for the building (if available through ISTC).
Krannert Center has identified several projects to tackle with the ECIP award funding:
The dollar amounts listed are approximations. Any additional funds not used for these items would be allocated to expanding the stock of replacement LED bulbs.