Projects Updates for collection: 2010 iCAP Projects

  1. special vote requested

    Revolving Loan Fund Selection Committee,

    The time is almost here to select another round of projects for the Revolving Loan Fund. For this upcoming selection we have approximately $1,000,000 to allocate. However, due to a timing issue I am appealing to the committee to decide on a Retro-Commissioning project in advance of the formal selection meeting. The reason for requesting Retro-Commissioning at Memorial Stadium early is due to a deadline associated with the availability of DCEO grant dollars. If expenditures and savings are realized prior to May 31, 2017, DIA could receive $100,000 in grant money from DCEO. Our meeting for project selection is targeted for the first week of May 2017 which does not give us enough time to qualify for the grant.

    Below is project specific information that would normally be presented at the project selection meeting. We don’t necessarily need to score this project, all we need is a majority decision (yes or no) to approve this project. If accepted, the committee would be considering $800,000 for allocation at the targeted May selection meeting.

    Project Name: Memorial Stadium Retro-Commissioning

    Project type: Retro-Commissioning

    Buildings: Memorial Stadium

    Energy Cost Savings: $300,000 /year

    Funding Request: $200,000

    Project Cost: $500,000 (DIA will contribute $200,000 and DCEO grant contribution will be $100,000)

    Payback Period: Approximately 2 Years

    General Description of Work:

    Provide temperature control upgrades & retro-commissioning services for the west and north portions of the stadium. During preliminary work, many noteworthy items have been identified. Several HVAC equipment scheduling improvements have been made already.

    Project Owners: Brett Stillwell (Athletics) / Karl Helmink (F&S)

    Project Execution Contact: Brett Stillwell (Athletics) / Karl Helmink (F&S)

    Criteria:

    1-      Payback Period: The payback period is approximately 2 years.

    2-      Reduction of Greenhouse Gas: Greenhouse gases will be reduced by 3,491,227 lbs due to conservation of electricity, chilled water, and steam.

    3-      Fund Size Impact: While grant dollars are available for this particular submission, the grant will not be used to increase the Revolving Loan Fund balance.

    4-      Visibility: Memorial Stadium is an iconic building for Athletics on campus.  The energy savings could be indirectly visible in that it could pay for other items that Athletics desires. There is a large amount of diversity in the usage of the space.

    5-      Project Coordination: Coordination items need to be considered as the south end zone & east grandstand project approaches. There are temporary plans to be considered prior to the arrival of this particular project.

    Other Pertinent Information:

    It is proposed that Athletics provide $200k for this project. Eileen Westervelt, via DCEO funding, has provided a building energy study which has identified large energy savings in this building of over $300,000 per year. It is suggested that to secure the $100K DCEO grant, $150K needs to be spent by May 31, 2017 and evidence will need to be presented that the indicated energy is being saved.

    The campus has realized a significant amount of utility savings due to the efforts made by the Retro-Commissioning teams and the expectation would be no different at Memorial Stadium. The data the Retro-Commissioning group has provided for this application predicts a very positive outcome which is consistent with most of their projects throughout campus.

    The reason for the expedited decision is to take advantage of the possible DCEO funds that will likely not be available in the future. Thanks again for your participation in this selection process and please let me know if you have any questions or concerns.

    I ask that you please reply with your individual yes or no votes before February 10, 2017.

    Thanks again,

    Josh Whitson

  2. Water & Stormwater SWATeam Meeting Minutes 2/2/2017

    Review of pending recommendations: BIF Greywater, Increase Cooling Tower COC, Design Center Greywater Piping. Discussion on possible edits to the SWAT/iWG process. Student members will submit proposal to Student Sustainability Commision for apermanent meter to measure BIF greywater use. The Water SWATeam will meet every other week and will have a joint meeting with the Agriculture, Land Use, Food, and Sequestration (ALUFS) SWATeam this semester. 

  3. Low Mow Zones signage inquiry to SWATeam

    F&S Director of Sustainability, Morgan Johnston, asked the ALUFS SWATeam for their input regarding the forthcoming "Low Mow Zone" sign updates.  She said, "I would like to talk with you about the “No Mow Zones” on campus and our efforts to better name them as “Low Mow Zones.”  Brent and Ryan Welch are working on updating the locations in a map form and our F&S communicators (primarily Steve Breitwieser) are developing a message about the updated words and locations. 

    As part of this effort, we are also going to be updating the signs, and I am hoping to get your help with taking a look at the specific sign locations (once we have the updated map).  We need a volunteer to visit each Low Mow Zone and note the

    • How many signs do we have in the existing locations?
    • Do any of them need to be moved for better visibility?
    • Do any of them need to have taller sign posts?
    • Where should signs be placed in the new zones?"

    The SWATeam chair, Brent Lewis, indicated she would be included in the first spring semester meeting.

  4. Discussion at Transportation Building about ECIP funds

    Morgan Johnston and Shawna Grady met to discuss the potential uses for the Transportation Building's ECIP funding award ($10,000).  Options included additional recycling bins, LED lamps, power strips, battery recycling containers, and potentially a waste characterization study for the building (if available through ISTC).

  5. EGEN SWATeam Meeting (1.20.17)

    The EGEN SWATeam held their first meeting for the Spring 2017 semester. Topics covered include:

    • Review draft recommendations for 1) on-campus solar and 2) petascale offsets
    • An update from Morgan Johnston on the Associate Director of Campus Sustainability position
    • Updating iCAP portal project pages for EGEN objectives
    • Clean Energy PPA
    • Potential for future solar farm
    • Asking for feedback from EGEN team members regarding recommendation proces
  6. KCPA ECIP funds to go towards several improvements

    Krannert Center has identified several projects to tackle with the ECIP award funding: 

    • Recycling Bins and Bags - $5,000 (make in-house recycling efforts more efficient and accessible)
    • TCP Switch for Playhouse - $6,000 (electrical safety issue)
    • Imop -  $5,000 (water conservation)
    • Food Services Dishwashers - $9,750 (energy efficiency, water conservation, chemical usage reduction)
    • Energy efficient washer and dryers (2 each) for Festival Green Room -  $2,250 (energy efficiency, water conservation)
    • Ipad mini’s & Ipad & Secure Mounts for Attendant Access to Calendar and Event Sheets - $2,500  (reduce printed paper)
    • Reconfigure Stairs to Playhouse Pit  - $3,500 (safety issue correction)

    The dollar amounts listed are approximations.  Any additional funds not used for these items would be allocated to expanding the stock of replacement LED bulbs.

  7. News Release - Solar Farm one year anniversary

    In its first year of commercial operation from December 11, 2015, to December 10, 2016, the Solar Farm generated 7,284 megawatt-hours (MWh) of clean, renewable energy for the Urbana campus, successfully meeting expectations.

    solar farmUnder a 10-year power purchase agreement (PPA) with Phoenix Solar South Farms, LLC, the university acquires all of the power generated by the Solar Farm and all associated renewable energy credits and carbon credits. Notable first-year production achievements of the Solar Farm include:

    • Provided 1.95% of projected FY17 annual electricity consumption1
    • Supplied almost 14% of the campus electrical demand at noon on April 3, 2016
    • Delivered 900 MWh of power to the campus grid in June 2016, the highest month of production
    • Frequently generated over 4 MW of power; system capacity is 4.68 MWac
    • Reduced the campus carbon footprint by more than 6,000 metric tons of CO2e

    The Illinois Climate Action Plan (iCAP), the Urbana campus’ strategic sustainability plan, set a goal of obtaining at least 120,000 MWh of power per year from low-carbon sources by FY20. With the Solar Farm’s electrical production and the university’s wind PPA with Rail Splitter Wind Farm LLC, the campus is 25% of the way toward meeting this goal.

    Hourly information on the Solar Farm’s energy production and impact to campus since first-connected in November 2015 is available at: http://go.illinois.edu/solar.

  8. Final Report by Logan Ebling

    Logan’s final paper. Pretty fun.

     

    Highlights:

    • “[Bicycle fleets] promotes positive social interactions.”
    • “..I think most of these worries go away [about bike fleets]… one issue that  I saw coming up almost every time a discussion …was money. While totally understandable, it is also frustrating that there is a lack of desire to spend even a low amount of money to purchase one bicycle for employee use.”
    • “…If they [departments] truly don’t have the money to spend, then perhaps the University as a whole should be assigning a sustainability budget specifically to each department that they can spend at their discretion in the name of sustainability.”
    • “Bicycling on campus is the fastest mode of transportation; however, that would not be the case if the bikes are not located conveniently right outside your door or at least at a building next door. For bike sharing dock-style to match the convenience of a dedicated bicycle at the department’s building, the docks would have to be ubiquitous across campus, quite literally outside every building. Financially and logistically, I don’t think that is possible. To me, departmental bicycle fleets would be entirely more convenient for staff needing to get around campus quickly and efficiently.”

     

    And, lastly, “In my opinion, the benefits are so numerous [for bike fleets] that the University should be aggressively funding and initiating bicycle fleets on campus.”

    ~per Lily Wilcock

  9. Idea for LEED transportation credit

    The LEED transportation credit for encouraging low emission vehicles can be obtained if there are dedicated spaces for low-emission vehicles near the building in question.  In general, the University is not adding new parking spaces for new buildings, so it is difficult to achieve this LEED point.  One method is to add a Zipcar space for the building, and another is to add an Electric Vehicle charging station.  Grant Colella, a Project Manager at F&S, suggested a long-term plan to change all of the campus fleet to low emission vehicles, so the dedicated service vehicle spaces would also be low emission vehicle spaces.

  10. ECBS SWATeam meeting minutes

    At the ECBS SWATeam meeting the report from student capstone project on attitudes toward fume hood energy conservation was discussed. There is a need to sign up the labs for the Freezer Challenge project before January 15, 2017. The last in the fall semester, the Illini Lights Out project is expected on December 9. The Status of Green Labs recommendation was discussed. 

  11. Status update for purchasing offsets

    iSEE is working with the Purchasing Division to publish a Request for Proposals (RFP) to purchase carbon offsets.  These will include replacement offsets for the 2015 Carbon Credits (CCs) sold, and an option to purchase an additional 10,000 CCs to start an internal virtual storeroom for voluntary departmental offsets.

  12. FY 16 RCx Progress Report

    Associated Project(s): 

    The Retrocommissioning (RCx) team has completed nine years of operation on campus in more than 60 campus buildings covering over 8 million square ft. of campus space, having begun our work in Aug. 2007. We have avoided utility costs of over $47M considering the campus fully loaded utility rate or $39M considering the campus variable utility rate. We have also secured millions of dollars in DCEO grants in the past years, including $1.5 million in FY16. We continue to accrue and maintain significant energy usage reductions (average of 27%) on our retrocommissioned buildings. This rate of energy reductions has been generally maintained for 8+ years. More investment in larger projects will be needed going forward to achieve larger energy conservation results.

    Attached Files: 
  13. Connecting F&S, TDM, and Wellness through student engagement

    Associated Project(s): 

    The UIUC Wellness Director Michelle Guerra, the Active Transportation Coordinator Lily Wilcock, and the F&S Director of Sustainability Morgan Johnston, are planning to identify a student to engage in the cross-section of the sustainability, wellness, and transportation efforts for this campus.  There are several aspects of these efforts that overlap, yet it is difficult to find time to keep each other informed.  The student could provide an important connection between these areas, while also learning of the inherently interdisciplinary aspects of sustainability, wellness, and transportation.

  14. Long-Term PPA Recommendation

    In Spring 2016, a recommendation was submitted to allow longer-term contracts for the purchase of renewable power. The institute for Sustainability, Energy, and the Environment (iSEE) is currently reviewing this request with campus legal counsel and Purchasing departments to determine feasible options and potential next steps.

  15. 2016 Winners Announced!

    The 2016 ECIP award winners were announced last Wednesday, and they will be given plaques at the annual Campus Sustainability Celebration this week, 10/16 from 4-6 at the Alice Campbell Alumni Center.  Here is the letter.

    Congratulations!

    We would like to recognize your unit as a 2016 Energy Conservation Incentive Program (ECIP) award winner during the Campus Sustainability Celebration on Wednesday, October 26 from 4-6 p.m. at the Alice Campbell Alumni Center. For planning purposes, please let us know who will be accepting the award(s) on behalf of your unit by Friday, October 21.

    Sustainability initiatives are at the core of Illinois’ commitment to its land-grant university mission. The Climate Leadership Commitment pledges the Urbana campus to be carbon neutral by 2050, which requires all students, staff, and employees working together to implement a dynamic, multi-disciplinary approach to campus sustainability.

    The ECIP awards began in 2013 as a way to recognize outstanding individual and team efforts that move us closer to reaching our Illinois Climate Action Plan (iCAP) goals. The ECIP honors occupants of campus buildings that have reduced energy at the greatest level from one year to the next. This year more than $177,000 for improvement projects in winning facilities will be provided through the program.

    Everyone researching, learning, and working in these nine buildings is an ECIP winner, and we encourage as many participants to join the celebration as possible.  Hosted by Facilities & Services and the Institute for Sustainability, Energy, and Environment, the Campus Sustainability Celebration will cover the iCAP objectives, celebrate the diverse sustainability community, and recognize 2016 winners. 

    We look forward to you and your employees joining us to celebrate the ECIP winners and their contributions toward campus energy conservation.

    2016 ECIP WINNERS

     Occupant Action Category

     % Improvement

    Incentive Award

    1. Atmospheric Sciences Building

    7.5%

                 $50,324

    2. Krannert Center for the Performing Arts

    4.8%

                   $34,111

    3. Institute of Government & Public Affairs Building

    4.4%

                   $15,083

    4. 1207 West Oregon Street (tie)

    2.9%

                   $10,048

    4. Temple Hoyne Buell Hall (tie)

    2.4%

                  $11,486

     Energy Advancement Category

     % Improvement

     Incentive Award

    1. Davenport Hall

    25.8%

                  $26,335

    2. Ceramics Kiln House

    21.2%

                  $10,000

    3. Transportation Building

    14.0%

                  $10,000

    4. Rehabilitation Education Center

    9.6%

                 $10,000

     

    Helen J. Coleman, LEED AP
    Interim Executive Director

    University of Illinois Urbana-Champaign
    Facilities & Services
    1501 South Oak St.
    Champaign, IL 61820
    Phone: (217) 265-8477
    E-mail: hjcolema@illinois.edu

     

  16. Weekly Update

    All, this past week we had 107 visitors. We grossed $1,185.60. We sold 11 memberships; 1 bike for $120; 1 build-a-bike for $75.

    This past week I also reinstated the First Visit Free policy that The Bike Project had kindly let me suspend for the new school year rush. Traffic to CBC has slowed enough that I can accommodate small and easy repairs. I don’t have numbers on that but it was only a few people that had minor enough problems to warrant a free visit; most who think they have a small repair in truth have many, many small repairs equaling large amounts of time/resources and we have them become members.

    On Monday of last week our cargo bike Bluebird was loaned to the Psychology Department for a day.  Lily delivered and retrieved it from them and I believe it was a successful endeavor.

    This coming week will be a short one. I will be out of town Thursday and Friday. During this abbreviated week I plan to work on storage ideas for the surplus of wheels we have in the shop, strip the half a dozen or so bikes that are taking up dead space, as well as the standard operations of building bikes and managing new-parts inventory.

    Jake Benjamin
    Campus Bike Center Manager

  17. e-Week survey message

    Associated Project(s): 

    Facilities and Services is collecting information on departmental bicycle fleets as part of the Campus Bicycle Plan. If you are interested in options for how to better sustain, grow or optimize your existing fleet, fill out the important survey by Oct. 14. Those interested in receiving information on starting a departmental bike fleet can fill out the form: http://go.fs.illinois.edu/bikefleet.

    Logan Ebeling . Facilities and Services