You are here

Projects Updates for place: Huff Hall

  1. Proposal for membership in the Green Sports Alliance

    Gopal Pareek presented a proposal for DIA to join the Green Sports Alliance to Brett Stillwell, with the attached files.  Brett indicated willingness to join and committed to completing the application for a standard membership ($500).

    https://greensportsalliance.org/about/

  2. Update from Gopal Pareek

    Gopal met with Professor Cheryl L. Cole about her work with the Green Sports Alliance.  She is also a teacher in RST.  He also is working on getting meetings with the SWATeams, to consider how DIA can help with the iCAP objectives. 

    Today, Gopal and Morgan White reviewed the data from the Energy Billing System for each of the DIA facilities, and discussed next steps for finalizing the energy and water reports, and coordinating them into the Building-Level Energy Report Card format.

    We also reviewed the template needs for the report card with Dee Dee Caneva at F&S, to make changes that would simplify the user's experience with the template.

  3. Update on progress

    Gopal Pareek and Morgan White met to review progress on the DIA CAP efforts.  Gopal received information from the Green Sports Alliance, including a proposal for UIUC to join the alliance.  He also pulled the energy, water, and sanitary sewer data for each of the DIA buildings, to review with Brett Stillwell.  The square footage for each facility is needed, as well as the natural gas use, when applicable.

    For our next meeting, Gopal will finalize the excel file data for the DIA buildings.  Morgan will put him in contact with the SWATeam clerks to talk about the DIA potential for helping with the iCAP objectives.

  4. Update on progress

    Gopal and Morgan reviewed the Big Ten schools in the Green Sports Alliance.  Gopal will find associated scores for the schools that are in that program.  He pulled data for the DIA buildings from the Energy Billing System, and put them into the consolidated format.  He also began reviewing the Green Sports Alliance programs.  During the next month, Gopal will contact the SWATeams to brainstorm potential ways DIA can help acheive the iCAP objectives for their topics.  He will also start a draft word document for the DIA CAP and list recommended actions for each chapter of the iCAP.

  5. Printing and Photographic Services Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 862 T-12 fixtures in the Printing and Photographic Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 151,916 hours. The simple payback for this project is 3.15 years.

  6. Agriculture Bioprocess Lab

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 436 T-12 fixtures in the Agriculture Bioprocess Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,289 hours. The simple payback for this project is 3.62 years.

  7. Animal Sciences A/C Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 50 T-12 fixtures in the Animal Sciences A/C Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 7,884  hours. The simple payback for this project is 3.56 years.

  8. University Press

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 488 T-12 fixtures in the University Press Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 76,948 hours. The simple payback for this project is 3.64 years.

  9. Transportation Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 547 T-12 fixtures in the Transportation Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 86,251 hours. The simple payback for this project is 3.56 years.

  10. Temple Hoyne Buell Hall

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 471 T-12 fixtures in Temple Hoyne Buell Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 74,267 hours. The simple payback for this project is 3.56 years.

  11. Speech and Hearing Clinic

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 47- T-12 fixtures in the Speech and Hearing Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 74,110 hours. The simple payback for this project is 3.08 years.

  12. Shelford Vivarium Greenhouse

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 335 T-12 fixtures in the Shelford Vivarium Greenhouse were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 52,823 hours. The simple payback for this project is 3.53 years.

  13. Personnel Services Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 433 T-12 fixtures in the Personnel Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,275 hours. The simple payback for this project is 3.2 years.

  14. Nuclear Physics Lab

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 415 T-12 fixtures in the Nuclear Physics Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 65,437 hours. The simple payback for this project is 3.56 years.

  15. Natural Resources Studies Annex

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 1,200 T-12 fixtures in the Natural Resources Studies Annex were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 189,216 hours. The simple payback for this project is 3.56 years.

  16. Levis Faculty Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 189 T-12 fixtures in the Levis Faculty Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 29,802 hours. The simple payback for this project is 3.56 years.

  17. International Studies Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 571 T-12 fixtures in the International Studies Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 90,035 hours. The simple payback for this project is 3.56 years.

  18. Illini Hall

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 610 T-12 fixtures in Illini Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 96,185 hours. The simple payback for this project is 3.56 years.

Pages

Subscribe to