The Deep Direct Use geothermal project has completed a preliminary assessment of steam
You are here
Geothermal at the Energy Farm (Proposed)
Project History
-
4/20/2018
-
2/23/2018
Frank Holcomb is working on investigating geothermal options for campus.
Project Family
-
Geothermal on Campus
- CEE Hydrosystems Energy Lab Geothermal
- Campus Instructional Facility (CIF) Geothermal
- Geothermal Monitoring Well on Bardeen Quad
- Geothermal Test Well at Energy Farm
- Geothermal at Allerton Park
- Geothermal at the Bielfeldt Athletic Administration building
- Geothermal at the Energy Farm
- Geothermal at the Fruit Farm Admin Building
- ISTC Geothermal Loop
Description
Project Team
-
Primary Contact:
Franklin HolcombTeam Members:
- Andy Stumpf
- Yu-Feng Lin
Dates
-
Investigated January 31, 2018Investigated by Frank Holcomb