    The 2010 iCAP included goals to increase renewable energy on campus.  Regarding solar energy, the 2010 iCAP said, "A full study for solar electric or thermal energies has not yet been conducted. Estimates of the built campus area of ~5 square kilometers can likely accommodate 5 percent solar photovoltaic (PV) array coverage as rooftop solar—or about 250,000 square meters, with peak generation capacity of 25 MW, and generating 45 million kWh of electricity. This has the potential to displace 10 percent of current campus electricity usage. Potential for larger tracking arrays on the South Farms also exists."  It also included the strategy, "Increase the amount of solar photovoltaic and thermal projects."

  2. Roger Adams Laboratory (completed)

    Associated Project(s): 

    A portion of the T-12 fixtures in the Roger Adams Laboratory were retrofitted in the 2008 leg of the ICECF Lighting Retrofit. The remaining 2,064 fixtures were replaced in the 2009 Retrofit, however, allowing an additional Annual kWh Savings of 157,759 hours. The Simple Payback for the replacing these fixtures in the remaining portion of the building is 3.34 years.

  3. Open House, April 2010

    Associated Project(s): 

    The Campus Bike Project, located at 608 East Pennsylvania Ave. in Champaign, will hold an open house on Friday, April 23, from noon to 5 p.m. in conjunction with Earth Day. Tours will be available every hour, on the hour, at 12 noon, 1 p.m., 2 p.m., 3 p.m., and 4 p.m.

    Attached Files: 
  4. Roger Adams Laboratory (portion)

    Associated Project(s): 

    Sixty-four lighting fixtures in a portion of the Roger Adams Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 10,092 hours. The Simple Payback for changing the fixtures in the Roger Adams Laboratory is 2.01 years.

  5. Undergraduate Library

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 2,294 T-12 fixtures in the Undergraduate Library were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 508,525 hours. The simple payback for this project is -0.17 years.

  6. 2010 Waste Reduction Plan

    From: Wegel, Carl V (Facilities & Services)
    Sent: Wednesday, March 31, 2010 3:31 PM
    To: Dempsey, John G (Facilities & Services)
    Subject: FW: Waste Reduction Plan 2010

     

    Jack,

     

    I asked Tracy to proceed.  We should be good for another 5 years.

     

    Carl

     

    From: Osby, Tracy L (Facilities & Services)
    Sent: Tuesday, March 30, 2010 5:35 PM
    To: Wegel, Carl V (Facilities & Services)
    Subject: Waste Reduction Plan 2010

    Carl,

     

    I have made the adjustments that were recommended and Tim has adjusted the numbers as needed. Unless notified differently, tomorrow Wednesday 3/31/10, I will proceed to send an e-version to:

     

    David E. Smith, Manager

    Illinois College Assistance Program for Recycling and Waste reduction (I-CAP)

    Department of Commerce and Economic Opportunity

    620 East Adams - CIPS 5

    Springfield, IL 62701 - 1615

     

    I will also have to send via U.S. mail an original and three copies (signed), as it is required according to the guidelines. Thanks

     

    Tracy Osby
    Facilities and Services
    Coordinator Of Campus Waste Management (Interim)
    Waste Transfer Station
    10 E. St. Mary's Road
    Champaign, IL 61820
    (217) 244 - 7283
    tosby@illinois.edu
     

    Attached Files: 
  7. Bevier Hall

    Associated Project(s): 

    A total of 1,982 lighting fixtures in Bevier Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 338,894 hours. The Simple Payback for changing the fixtures inBevier Hall is 1.26 years.

  8. Noyes Laboratory

    Associated Project(s): 

    A total of 1,574 lighting fixtures in the Noyes Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 276,264 hours. The Simple Payback for changing the fixtures in the Noyes Laboratory is 0.94 years.

  9. Campus Bike Project soft opening, March 2010

    Associated Project(s): 

    The Campus Bike Project (later named the Campus Bicycle Shop) opened in March of 2010 during Naturally Illinois and began serving the campus for 16 hours per week (open Monday mornings, Friday afternoons, and Sunday and Tuesday evenings).

    A press release was sent out and is attached here.

    Attached Files: 
  10. High Tunnels

    Associated Project(s): 

    The Student Sustainable Farm began using high tunnels, which allow for year-round production. The farm will begin with salad greens, leaf lettuce, and braising greens.

  11. Davenport Hall

    Associated Project(s): 

    A total of 2,030 lighting fixtures in Davenport Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 363,141 hours. The Simple Payback for changing the fixtures in Davenport Hall is 1.36 years.

  12. Freer Hall

    Associated Project(s): 

    A total of 629 lighting fixtures in Freer Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 100,595 hours. The Simple Payback for changing the fixtures in Freer Hall is 2.49 years.

  13. Natural History Building

    Associated Project(s): 

    A total of 2,153 lighting fixtures in the Natural History Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 345,994 hours. The Simple Payback for changing the fixtures in the Natural History Building is 2.37 years.

  14. Funding for employee from F&S Executive Director

    Associated Project(s): 

    This afternoon, I verified with Jack Dempsey that he is still willing to fund a 900-HR extra-help employee for the first year of the new Campus Bike Project.  The employee will be paid $12.00 per hour for 900 hours, so the full cost is $10,800. - Morgan Johnston

  15. Main Library (6th Stack)

    Associated Project(s): 

    A total of 379 lighting fixtures in the Main Library (6th Stack) were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 55,547 hours. The Simple Payback for changing the fixtures in the Main Library (6th Stack) is 6.66 years.

  16. Turner Student Services Building

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 628 T-12 fixtures in the Turner Student Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 99,474 hours. The simple payback for this project is 2 years.