You are here
- Home
- Week 10 Update
Week 10 Update
Posted by Austin Jung on April 5, 2019
Good Afternoon All,
This week’s meeting was productive and we were able to set up the excel spreadsheets needed to record data on the chiller plants, Abbott, and potable water. Over the past week I researched and created a checklist and table for conducting a water audit. The checklist will be shared here after some final corrections are made to it. I was able to determine what was needed and where stamped flow volumes are marked on each fixture. If there is no stamp on faucets there is a simple tool called a flow rate bag that will be purchased so auditors can determine the flow manually. As for urinals and lavatories the model and serial number will be recorded to search the model manually and figure out the flow rate. There is no hand tool to determine these flow rates.
The spreadsheets will be given to Mike Marquissee so his team can collect the data we need faster. Once the data is collected some analysis of it will be done to help us determine efficiencies and water consumption of the different facilities. Also it will help us figure out if we have line losses in our systems.
The next steps to be done this week is to get these excel spreadsheets to Mike and give him some time to gather all of the data we need. Analyze the raw data and compare the values to industry and national standards. This will allow us to figure out where we stand in our water consumption. Finish editing the water audit checklist and add snap shots of where the stamps can be located so it will be easier for auditors to know where to look. The water audit program we are creating right now will mainly be used for bathrooms and kitchens in university buildings. Research laboratories and student laboratories will be done by another team and program in the works.
Thank You,
Austin Jung