Posted by Sarthak Prasad on February 21, 2019
We plan to start the DTRT test next Thursday (Feb 28, 2019). We will be circulating heated water through the loop for 72 hrs, then turn off the water and measure the subsurface temperatures with the DTS system for roughly a week.