CUYSS Team|8/5/2020
You are here
English Building
Projects at this location
Project | Description |
---|---|
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. |
Infrastructure Security and Energy Restoration (ISER) |
This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure. |
Building Technologies Office |
The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include |
Structural and Architectural Engineering and Materials (SAEM) |
SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures. |
FY16 RCx |
In FY16, the Retrocommissioning teams completed six buildings. |
Bee Campus USA |
Bee Campus USA is a nation-wide movement to support pollinators on university campuses. A university that is Bee Campus USA-certified proves that they are progressing in awareness, native plant landscapes, and safe pest management. The Bee Campus committee developed an official web page in spring 2018 and worked with Facilitites & Services to develop a University Habitat Plan. In addition, with funding from the SSC, we will be installing pollinator signage on campus in fall 2018.
|
ICECF 2008 Lighting Retrofit |
The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13. |
Project Updates
-
8/6/2020
-
8/5/2020
The Bee Campus USA renewal efforts are documented in this updated Bee Campus plan.