As part of the Lighting Retrofit #5, 862 T-12 fixtures in the Printing and Photographic Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 151,916 hours.
You are here
Civil Engineering Hydrosystems Laboratory
Projects at this location
Project | Description |
---|---|
CEE Hydrosystems Energy Lab Geothermal |
Geothermal energy foundations will be installed this summer as part of the Department of Civil and Environmental Engineering’s (CEE) Ven Te Chow Hydrosystems Laboratory addition at the University of Illinois at Urbana-Champaign. Substantial completion of the renovation is expected in Summer 2020. |
Lighting Retrofit #5 |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
Project Updates
-
12/20/2013
-
10/15/2013
As part of the Lighting Retrofit #5, 436 T-12 fixtures in the Agriculture Bioprocess Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,289 hours.