You are here

Animal Sciences Laboratory

1207 West Gregory Drive
61801 Urbana , IL
United States
Illinois

Projects at this location

Project Description
Freezer Challenge

"The International Laboratory Freezer Challenge promotes sample accessibility, sample integrity, reduced costs, and energy efficiency by harnessing a spirit of competition within and between laboratories. Challenge participants use well-evidenced criteria and best practices that support science quality and resilience while minimizing total costs and environmental impacts of sample storage."
click the link for more information and to REGISTER:
https://www.freezerchallenge.org/register.html

Infrastructure Security and Energy Restoration (ISER)

This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure.

Building Technologies Office

The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include 

  1. Emerging Technologies
  2. Residential Building
Structural and Architectural Engineering and Materials (SAEM)

SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures.

FY09 RCx

During the second year of Retrocommissioning (RCx), a second team was added in January 2009.  The motto was now "Saving the Planet Two Buildings at a Time."  In this fiscal year, the RCx efforts completed seven buildings.

Lighting Retrofit #5

In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years.