Projects at this location

Project Description
Infrastructure Security and Energy Restoration (ISER)

This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure.

Building Technologies Office

The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include 

  1. Emerging Technologies
  2. Residential Building
Solid Waste Management Grants

This program reduces or eliminates pollution of water resources by providing funding for organizations that provide technical assistance or training to improve the planning and management of solid waste sites.

Structural and Architectural Engineering and Materials (SAEM)

SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures.

FY16 RCx

In FY16, the Retrocommissioning teams completed six buildings.  

Waste Stream Characterization Study Phase 1

F&S has requested a proposal from the Illinois Sustainable Technology Center (ISTC) to get waste stream audits for select buildings across campus.  The program will repeat the efforts completed by ISTC at their building, on a larger scale.  This project could eventually extend to cover all campus facilities, or it could be done at select locations on a recurring basis to measure progress.

Lighting Retrofit #5

In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years.

Project Updates

  • 4/2/2015

    Dear iCAP Working Group Members,

    As a reminder, we will be meeting this Thursday at 1:30 (and also next Thursday, 4/9, at 1:30).

  • 11/16/2014

    Final Waste Stream Characterization Study of Swanlund Administration Building, Henry Administration Building, the Illini Union Bookstore, and the Alice Campbell Alumni Center.