Projects at this location
Project | Description |
---|---|
Freezer Challenge |
"The International Laboratory Freezer Challenge promotes sample accessibility, sample integrity, reduced costs, and energy efficiency by harnessing a spirit of competition within and between laboratories. Challenge participants use well-evidenced criteria and best practices that support science quality and resilience while minimizing total costs and environmental impacts of sample storage." |
Styrecycle: Expanded polystyrene (EPS) recycling program |
Dart Container at 1505 E. Main St., Urbana, accepts expanded polystyrene (EPS), more commonly known by its brand name Styrofoam, for recycling. Departments are encouraged to take EPS there to recycle this bulky material. By doing so, we can reduce the volume of waste sent from campus to landfills and avoid the harmful environmental impacts of that practice. There is no charge to drop off EPS at Dart for recycling. There is currently no central funding source to pay for transportion of EPS to Dart, so departments need to arrange transport independently. |
Waste Stream Characterization Study Phase 2 |
The primary deliverable of this proposed project is to provide a detailed waste characterization assessment for three facilities located throughout the Urbana-Champaign campus of the University of Illinois. Lincoln Avenue Residence Halls (LAR), Business Instructional Facility (BIF), Roger Adams Laboratory(RAL) are facilities that will be characterized. |
2012 Exterior Doorway LED Lighting |
Exterior lighting was installed at multiple locations in 2012, with more locations planned for the future. LED fixtures to increase illumination around doorways are installed at Talbot Lab, the Computer Applications Building, Roger Adams Lab, and the Vivarium. Entry canopy lighting at the Activities and Recreation Center (ARC) and Allen Hall are also upgraded to LED fixtures. |
ICECF 2009 Lighting Retrofit |
The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17. |
ICECF 2008 Lighting Retrofit |
The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13. |
Project Updates
-
3/2/2020
-
11/11/2019
The registration for the 2020 Freezer Challenge is now open!