The Office of the Provost approved $75,000 in one-time funding for the next step in the LED Exit Sign retrofit project.
You are here
Music Building
Projects at this location
Project | Description |
---|---|
Infrastructure Security and Energy Restoration (ISER) |
This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure. |
Building Technologies Office |
The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include |
Structural and Architectural Engineering and Materials (SAEM) |
SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures. |
FY09 RCx |
During the second year of Retrocommissioning (RCx), a second team was added in January 2009. The motto was now "Saving the Planet Two Buildings at a Time." In this fiscal year, the RCx efforts completed seven buildings. |
LED Exit Signs |
As part of the iCAP and LED Campus initiatives at the University, incandescent and flourescent bulbs in Exit Signs are being replaced with LEDs. This is part of the LED Campus commitment to replace all interior wayfinding fixtures on campus by 2025. |
ICECF 2009 Lighting Retrofit |
The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17. |
Project Updates
-
3/10/2017
-
1/11/2017
F&S Building Maintenance submitted the attached funding request to the F&S Director of Shared and Administrative Services for the next round of the LED Exit Sign projects.