Work orders were submitted for the following locations:
- Armory, floors 1 and 3
- Wohlers Hall, floors 1 and 2
- Loomis Lab, floors 1 and 2
- Siebel Center, basement and floor 1
- Natural Resources Building, floors 1 and 2
The Housing location at Ikenberry Commons (actually called Student Dining and Residential Programs, SDRP) was discussed with John Humlicek, and they have already installed bottle fillers at that location. They are also working to install one per floor of all residence halls.
The Library locations have been shared with Jeff Schrader in the Library to get his input before installation proceeds.